Requirement For | Site Engineer for Underground Metro Project | HCC | 5 - 10 Years | Mumbai

Job Description:
  • For Casting Yard
  • Responsible for making Method statement for Segmental Construction for Underground Metro. 
  • Tunnel Segment Casting.
  • Tunnel Segment Cage fabrication & maintain proper dimensions
  • Reading Drawings and executing at site
  • Calibration of moulds.
  • Trial ring.
  • Material Approval from PMC. 
  • Quality assurance.
  • Preparation Stacking Yard.
  • Erection & Supervision of Segment Casting Yard.
  • Inspection and Making Report of Site Equipment.
  • Prepare & Submission the Delay reports and analysis.
  • Preparation Daily Progress Report.
  • Good Idea of IS Standards and ISO Systems.

To apply via Naukri, click here! 
Requirement For | Site Engineer for Underground Metro Project | HCC | 5 - 10 Years | Mumbai Requirement For | Site Engineer for Underground Metro Project | HCC | 5 - 10 Years | Mumbai Reviewed by Admin on 8:00:00 PM Rating: 5

No comments:

Copy rights @constructionplacements.in 2016. Powered by Blogger.