Walk-In Interview on 19 June - 23 June 2017 | Foreman Electrical (PMV ) | SPCL | 5 - 10 Years | Mehsana

Construction Placements
Requirement in Shapoorji Pallonji And Company Private Limited, SPCL Is one of the foremost Indian Construction companies. We build a brand that endures. The first Indian Construction Company to possess ISO 9001:2000 certification with International Ops. in Middle East, Gayana, and Afghanisthan. The SPCL is an Indian business conglomerate in India with interests in construction, real estate, textiles, engineering goods, home appliances, shipping, publications, power, and biotechnology.

Walk-In Interview on
19 June 2017 - 23 June 2017    10AM

Venue :
Shapoorji Pallonji And Company Private Limited,
Venus Amadeus, 301-305, 3rd Floor,
Jodhpur Cross Road, Satellite,
Ahmedabad 380 015
Preference will be given to the profiles from CORE CONSTRUCTION COMPANY
Experience Require - - Commercial Projects, Industrial, Residential Projects.

Plans, assigns, schedules, and supervises the work of power linesmen, electricians, and helpers engaged in the construction, installation, maintenance, and repair of construction site power lines, electrical systems, fixtures, apparatus, and appliances on construction site like batching plant, tower cranes etc.

Trains and instructs subordinates on detailed procedures.

Conducts periodic inspections and gives on-site supervision over hazardous or unusual work assignments; assures availability of equipment, spares, and supplies.

Estimates the time and material costs required for projected jobs; keeps cost and job records and submits reports; initiates requisitions for supplies, tools, and equipment.

Supervises the operation of the electrical repair shop.

Enforces safety regulations, rules, and working conditions.

Maintain records on electrical jobs and assign to appropriate personnel.

Assist in coordinating job assignments with the other trades, e.g., plumbers, carpenters, etc.

Proactively controls energy consumption & ensures uninterrupted power supply.

Assist contractors on jobs.

Plans for backup power supply & keeps ready alternate router.
Maintain knowledge of electrical materials in warehouse.

Advise coordinator and assistant director of technical problems concerned with installation, modification and repair of electrical assignments.

Recommend procedure revisions when necessary to fully utilize assigned personnel and equipment.

Determine procedures for maintenance, installation, modification and repair of electrical assignments.

Experience installing, assembling, testing, and maintaining electrical or electronic wiring, conduit, wiring, cable, equipment, components, and devices associated with electrical equipment following drawings of electrical layouts and building plans.

Knowledge of HT/LT lines, its associated panel, broken safety devices to control the network.

Knowledge of EB-Electricity board supply regulations / requirements.

Knowledge of safety electrical network.

Eligibility Criteria :

1. Full time education is must .Profiles from distance education & Gap in Qualification will not be entertained.
2. Candidate should be aware of Job Requirement.
3. Preference will be given to the profiles from core construction companies.
4. Candidate should be physically fit to work at site.
5. Stability in a work experience is must.
6. Candidates who have already appeared for interview earlier will not be entertained.
7. Candidate should be ready to relocate any where in India.

Walk-In Interview on 19 June - 23 June 2017 | Foreman Electrical (PMV ) | SPCL | 5 - 10 Years | Mehsana Walk-In Interview on 19 June - 23 June 2017 | Foreman Electrical (PMV ) | SPCL | 5 - 10 Years | Mehsana Reviewed by Admin on 9:47:00 AM Rating: 5

No comments:

Copy rights @constructionplacements.in 2016. Powered by Blogger.